Snorkel UL40 User Manual

Browse online or download User Manual for Special machinery Snorkel UL40. Snorkel UL40 User Manual [en]

  • Download
  • Add to my manuals
  • Print
  • Page
    / 8
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 0
1
UL25, UL32 & UL40
Operator Manual
UL25, UL32 & UL40
SERIAL NUMBERS 15001 TO CURRENT
WARNING
All personnel shall carefully read, understand and follow all safety rules, operating
instructions and the Scaffold Industry Association's MANUAL OF RESPONSIBILITIES
before performing maintenance on or operating any UpRight aerial work platform.
SAFETY RULES
Safety Rules and Operating Instructions
Safety Rules and Operating Instructions
NEVER attempt to
move the UpRight
Lift with people or
materials on the
platform or with
the platform
elevated.
NEVER elevate
platform unless all
four (4) outriggers
have been properly
installed. All
outrigger screwjack
pads must be in solid
contact with a firm
surface before the
platform is elevated.
NEVER operate the machine
within ten feet of power lines.
THIS MACHINE IS NOT
INSULATED.
NEVER sit, climb, or stand on the
platform guardrails or midrail.
NEVER elevate platform without
first leveling the base.
NEVER use ladders, planks or other devices to increase the height of the platform.
NEVER attach overhanging loads to the platform or increase the platform size.
NEVER elevate the platform if it contains more than one person or more than the rated load (see specifica-
tions on back page).
LOOK up, down and around for overhead obstructions and electrical conductors.
NEVER change operating or safety systems.
NEVER use outriggers from one model on another model.
CLOSE and secure cage after entering platform.
INSPECT the machine thoroughly for cracked welds, loose or missing hardware, hydraulic leaks, damaged
control or power cables and loose wire connections.
NEVER use the machine as a freight or personnel elevator.
NEVER recharge battery near sparks or open flame; batteries that are being charged emit highly explosive
hydrogen gas.
AFTER USE secure the work platform against unauthorized use by turning key switch off and removing key.
NEVER replace any component or part with anything other than original UpRight replacement parts without
the manufacturer's consent.
Page view 0
1 2 3 4 5 6 7 8

Summary of Contents

Page 1 - Operator Manual

1UL25, UL32 & UL40Operator ManualUL25, UL32 & UL40SERIAL NUMBERS 15001 TO CURRENTWARNINGAll personnel shall carefully read, understand and fol

Page 2 - Operation

2Outrigger Installation1. Remove the outriggers from storage locationson sides of mast.2. Insert into outrigger socket in base (Figure 1).3. Push in u

Page 3 - Battery Maintenance

3EMERGENCY LOWERINGIf the platform should fail to lower, NEVERclimb down the mast.Ask a person on the ground to open the Emer-gency Lowering Valve to

Page 4 - BATTERY CHARGING (Figure 4)

4LoadersDC MODELSDisconnect the plug from the battery box andremove the battery box from the rear of the ma-chine (Figure 4).The battery box is heavy,

Page 5 - DC Models

5UNLOADING1. Unsecure the unit.2. Release the locking pin and pull the T-handleout until the locking pin engages the hole in theend of the T-handle.3.

Page 6 - Passage Through A Doorway

6Passage Through A DoorwayThe UL32 and UL40 are equipped with a casteredrear Tilt Back assembly. When the unit is tiltedback onto this support frame,

Page 7

7UL LIFT LABEL INSTALLATION: THESE LABELS SHALL BE PRESENT AND IN GOODCONDITION BEFORE OPERATING THE WORK PLATFORM. BE SURE TO READ,UNDERSTAND AND FOL

Page 8 - FOR MORE INFORMATION

8Specifications*ROUTINE SERVICEUse the following table as a guide for routine maintenance, refer to Service Manual for complete serviceinstructions.SE

Related models: UL32 | UL25 |

Comments to this Manuals

No comments